| Bridge over the Paraná River | |
| Eldorado (Argentina) - Mayor Otaño (Paraguay) | |
| Typologie | Cable Stay Bridges |
| Date | Septembre, 2016 |
| Mission | Preliminary design |
| Client | BID - Banco Interamericano de Desarrollo |
| Bridge over the Paraná River | |
| Eldorado (Argentina) - Mayor Otaño (Paraguay) | |
| Typologie | Cable Stay Bridges |
| Date | Septembre, 2016 |
| Mission | Preliminary design |
| Client | BID - Banco Interamericano de Desarrollo |