foto_ps_0216_9898.jpg
Structures of the Ávila-Salamanca highway. Peñalba section
Avila, Spain
Typologie Road & Highway Bridges
Mission Detailed design
Constructeur FCC Construcción
Maîtrise d'ouvrage Ministerio de Fomento
Detailes design of the structures of the Peñalba de Ávila and San Pedro del Arroyo section of the A-50 motorway, with a length of 9.16 km, and a double carriageway with 2 lanes in each direction with a median of 10 m and external shoulders of 2, 5 m and internal shoulders of 1 m.

The viaducts of Berlanas and Cárcava-Cardiel of 180 and 160 m of lightened prestressed slab are highlighted. There are also 3 bridges over streams of double T beams, 5 overpasses of post-stressed concrete and 4 concrete box culverts.
Pro
Detailes design of the structures of the Peñalba de Ávila and San Pedro del Arroyo section of the A-50 motorway, with a length of 9.16 km, and a double carriageway with 2 lanes in each direction with a median of 10 m and external shoulders of 2, 5 m and internal shoulders of 1 m.
The viaducts of Berlanas and Cárcava-Cardiel of 180 and 160 m of lightened prestressed slab are highlighted. There are also 3 bridges over streams of double T beams, 5 overpasses of post-stressed concrete and 4 concrete box culverts.
Structures of the Ávila-Salamanca highway. Peñalba section
Avila, Spain
Typologie Road & Highway Bridges
Mission Detailed design
Constructeur FCC Construcción
Maîtrise d'ouvrage Ministerio de Fomento
Detailes design of the structures of the Peñalba de Ávila and San Pedro del Arroyo section of the A-50 motorway, with a length of 9.16 km, and a double carriageway with 2 lanes in each direction with a median of 10 m and external shoulders of 2, 5 m and internal shoulders of 1 m.

The viaducts of Berlanas and Cárcava-Cardiel of 180 and 160 m of lightened prestressed slab are highlighted. There are also 3 bridges over streams of double T beams, 5 overpasses of post-stressed concrete and 4 concrete box culverts.
web2_9899.jpg
emplacement