peatonal_10210.png
Bridge over river Cedrino
Orosei, Italy
Typologie Tender Design
Date Septembre, 2024
Mission Tender design
Client Centrale Unica di Committenza Unione dei Comuni Valle del Cedrino
Design Fhecor
Maîtrise d'ouvrage UNIONE DEI COMUNI DELLA VALLE DEL CEDRINO
The main bridge has an overall length of 280 m, measured between the centerlines of the abutments, with a straight alignment. It consists of five spans of varying lengths: 34 + 36 + 140 + 36 + 34 m. The cross-section is 25 m wide and accommodates two lanes in each direction. The main arch bridge crossing the Guadalfeo River has a span between supports of 140.0 m, comparable to the bridge subject of this competition.

The deck consists of a multicellular prestressed reinforced concrete box section, 10.0 m wide and 2.50 m deep. The number of webs in the box differs between the central span (L = 140 m), which has 3, and the side approach spans (L = 34 m and 36 m), which have 2. The cross-section is completed by diaphragms made of precast concrete beams spaced 4.0 m apart.
Pro
The main bridge has an overall length of 280 m, measured between the centerlines of the abutments, with a straight alignment. It consists of five spans of varying lengths: 34 + 36 + 140 + 36 + 34 m. The cross-section is 25 m wide and accommodates two lanes in each direction. The main arch bridge crossing the Guadalfeo River has a span between supports of 140.0 m, comparable to the bridge subject of this competition.
The deck consists of a multicellular prestressed reinforced concrete box section, 10.0 m wide and 2.50 m deep. The number of webs in the box differs between the central span (L = 140 m), which has 3, and the side approach spans (L = 34 m and 36 m), which have 2. The cross-section is completed by diaphragms made of precast concrete beams spaced 4.0 m apart.
Bridge over river Cedrino
Orosei, Italy
Typologie Tender Design
Date Septembre, 2024
Mission Tender design
Client Centrale Unica di Committenza Unione dei Comuni Valle del Cedrino
Design fhecor
Maîtrise d'ouvrage UNIONE DEI COMUNI DELLA VALLE DEL CEDRINO
The main bridge has an overall length of 280 m, measured between the centerlines of the abutments, with a straight alignment. It consists of five spans of varying lengths: 34 + 36 + 140 + 36 + 34 m. The cross-section is 25 m wide and accommodates two lanes in each direction. The main arch bridge crossing the Guadalfeo River has a span between supports of 140.0 m, comparable to the bridge subject of this competition.

The deck consists of a multicellular prestressed reinforced concrete box section, 10.0 m wide and 2.50 m deep. The number of webs in the box differs between the central span (L = 140 m), which has 3, and the side approach spans (L = 34 m and 36 m), which have 2. The cross-section is completed by diaphragms made of precast concrete beams spaced 4.0 m apart.
alzado_01_10211.png
planta_10212.png
noche_10213.png
alzado_02_10214.png
emplacement
Projets en lien