Rehabilitation and Widening of the Bridge over the Guadalquivir River
Villa del Río, Spain
Typologie Rehabilitation Of Bridges
Date Août, 2025
Mission Detailed design
Client Junta de Andalucia
Constructeur UTE Magtel - Hierros Fuente Palmera
Maîtrise d'ouvrage Junta de Andalucia
The bridge dates back to the early 20th century and consists of five masonry arches and three riveted steel lattice spans, with a through-arch (deck-below) configuration. Prior to the intervention, the bridge showed functional and structural deficiencies, as it was subject to load ограничения and its width of barely 5 m only allowed one-way traffic.

The works designed by FHECOR made it possible to widen the deck to 12.8 m, allowing for one 3.50 m lane in each direction. To achieve this, each of the steel spans was dismantled, strengthened, and widened on the ground, and a temporary bridge was installed to maintain traffic flow during the construction works.
Pro
The bridge dates back to the early 20th century and consists of five masonry arches and three riveted steel lattice spans, with a through-arch (deck-below) configuration. Prior to the intervention, the bridge showed functional and structural deficiencies, as it was subject to load ограничения and its width of barely 5 m only allowed one-way traffic.
The works designed by FHECOR made it possible to widen the deck to 12.8 m, allowing for one 3.50 m lane in each direction. To achieve this, each of the steel spans was dismantled, strengthened, and widened on the ground, and a temporary bridge was installed to maintain traffic flow during the construction works.
Rehabilitation and Widening of the Bridge over the Guadalquivir River
Villa del Río, Spain
Typologie Rehabilitation Of Bridges
Date Août, 2025
Mission Detailed design
Client Junta de Andalucia
Constructeur UTE Magtel - Hierros Fuente Palmera
Maîtrise d'ouvrage Junta de Andalucia
The bridge dates back to the early 20th century and consists of five masonry arches and three riveted steel lattice spans, with a through-arch (deck-below) configuration. Prior to the intervention, the bridge showed functional and structural deficiencies, as it was subject to load ограничения and its width of barely 5 m only allowed one-way traffic.

The works designed by FHECOR made it possible to widen the deck to 12.8 m, allowing for one 3.50 m lane in each direction. To achieve this, each of the steel spans was dismantled, strengthened, and widened on the ground, and a temporary bridge was installed to maintain traffic flow during the construction works.