| Bridge over the Paraná River | |
| Eldorado (Argentina) - Mayor Otaño (Paraguay) | |
| Structural typology | Cable Stay Bridges | 
| Date | September, 2016 | 
| Scope | Preliminary design | 
| Cliente | BID - Banco Interamericano de Desarrollo | 
        
        | Bridge over the Paraná River | |
| Eldorado (Argentina) - Mayor Otaño (Paraguay) | |
| Structural typology | Cable Stay Bridges | 
| Date | September, 2016 | 
| Scope | Preliminary design | 
| Cliente | BID - Banco Interamericano de Desarrollo |