Rehabilitation and Widening of the Bridge over the Guadalquivir River
Villa del Río, Spain
Structural typology Rehabilitation Of Bridges
Date August, 2025
Scope Detailed design
Cliente Junta de Andalucia
Construction UTE Magtel - Hierros Fuente Palmera
Owner Junta de Andalucia
The bridge dates back to the early 20th century and consists of five masonry arches and three riveted steel lattice spans, with a through-arch (deck-below) configuration. Prior to the intervention, the bridge showed functional and structural deficiencies, as it was subject to load ограничения and its width of barely 5 m only allowed one-way traffic.

The works designed by FHECOR made it possible to widen the deck to 12.8 m, allowing for one 3.50 m lane in each direction. To achieve this, each of the steel spans was dismantled, strengthened, and widened on the ground, and a temporary bridge was installed to maintain traffic flow during the construction works.
Pro
The bridge dates back to the early 20th century and consists of five masonry arches and three riveted steel lattice spans, with a through-arch (deck-below) configuration. Prior to the intervention, the bridge showed functional and structural deficiencies, as it was subject to load ограничения and its width of barely 5 m only allowed one-way traffic.
The works designed by FHECOR made it possible to widen the deck to 12.8 m, allowing for one 3.50 m lane in each direction. To achieve this, each of the steel spans was dismantled, strengthened, and widened on the ground, and a temporary bridge was installed to maintain traffic flow during the construction works.
Rehabilitation and Widening of the Bridge over the Guadalquivir River
Villa del Río, Spain
Structural typology Rehabilitation Of Bridges
Date August, 2025
Scope Detailed design
Cliente Junta de Andalucia
Construction UTE Magtel - Hierros Fuente Palmera
Owner Junta de Andalucia
The bridge dates back to the early 20th century and consists of five masonry arches and three riveted steel lattice spans, with a through-arch (deck-below) configuration. Prior to the intervention, the bridge showed functional and structural deficiencies, as it was subject to load ограничения and its width of barely 5 m only allowed one-way traffic.

The works designed by FHECOR made it possible to widen the deck to 12.8 m, allowing for one 3.50 m lane in each direction. To achieve this, each of the steel spans was dismantled, strengthened, and widened on the ground, and a temporary bridge was installed to maintain traffic flow during the construction works.